Project Scopes of Work (2009-2001)

 All project annual reports for each recovery element are on this page.

Link to Scopes of Work from 2010-Present

Scopes of Work: Instream Flow Management (2009-2001)

Project Title 2009-2008 2007-2006 2005-2004 2003-2002 2001
8 Recovery Pgm Gage O&M 08-09 06-07 04-05 02-03 01
8a Other Gage Activities 06-07 02-03
9 Water Acq. Consultant 08-09 06-07 02-03 01
19 Hydrology Support 08-09 06-07
19b Biology Hydrology Support 06-07 04-05 02-03 01
19h Water Acq. Hydrology Support 04-05 02-03 01
67 Steamboat Water Lease 06-07 04-05 02-03 01
70 CO Instream Flow Protection 06-07 04-05 02-03 01
71 CO River Decision Support Sys. 08-09 06-07 04-05 02-03 01
71a Refinement of CRDSS Model 01
84 Duchesne River Biol. Studies 01
85 Channel/Sed. Mon. 02
85a Mainstem Colorado Sed. Mon. 01
85b Green/Yampa Sed. Mon. 02-03 01
85c Upper CO R. Channel Mon. 04-05 02-03 01
85d Green R. Sed. Mon. 02-03 01
86 Geomorph. Peer Rev. 08-09 06-07 02-03 01
104 Fluctuating Flow Effects on CPM 02-03 01
107 Gunn. R. Temp. Model 02-03 01
108 Price R. Study 04-05 02-03 01
113 Gunn. PBO/Mgmt. Plan 06-07 04-05 02-03
114 Tributary PBO/Mgmt. Plan 06-07 04-05 02-03
114a Tributary Water Projections 02-03
124 Duchesne R. Hab. Meas. 06-07 04-05
155 Elkhead Transit Loss 08-09
156 Digital Photography/HD Video 08-09
C-9 Elkhead Enlargement, O&M, and Lease 04-05 02-03 01
C-11 Grand Valley Water Management 06-07 04-05 02-03 01
C-14/12c Coord. Res. Op. Pub. Involv. 08-09 06-07 04-05 02-03 01
C-24 Duchesne Coord. Resv. Operations 01
C-25 Coord. Facilities Study (CFOPS) 01
C-30 Gunnison Riv. Water Demand Study 01
Flow Recommendation Studies
FR-Duchesne Sed. Mon. 08-09 06-07
FR-115 Effects of Flaming Gorge Releases 08-09 06-07 04-05 02-03
FR-Floodplain Hab. vs. Flow Synth. 08-09
FR-Sed.Mon. (85f) USGS Sediment Monitoring 08-09 06-07 04-05
FR-Backwater Topography 08-09

Scopes of Work: Habitat Restoration (2009-2001)

Title 2009-2008 2007-2006 2005-2004 2003-2002 2001
C-4b Redlands Fish Passage Operation 08-09 06-07 04-05 02-03 01
C-4b GVP Fish Passage Operation 08-09 06-07
C-4c Redlands Ladder/Gage O&M 04-05 02-03 01
C-5 Price-Stubb Fish Passage 08-09 06-07 04-05 02-03 01
C-6 Floodplain Restoration 02-03 01
C-6/BT Bonytail Restoration/Middle Green 02-03
C-6/bt/rz Larval BT/RBS 4 Sites 04-05
C-6/Habitat Construction 04-05
C-6/Easement & Weeds Mgmt. 08-09 06-07 04-05 02-03 01
C-6/GP Gravel Pit/NNA Eval. 01
C-6/Hydrology/ Geomorphology 08-09 06-07 04-05 02-03 01
C-6/Land Acquisition 02-03 01
C-6/Larval Drift/Entrainment 02-03 01
C-6/Old Charlie Wash, Leota, Johnson 01
C-6/RZ Larval RBS/Middle Green 04-05 02-03 01
C-6/RZ-RECR RBS Recruitment 08-09 06-07 04-05
C-6/rz/bt Larval RBS/BT Baeser 08-09 04-05
C-23 GVP Fish Passage & Screen O&M 08-09 06-07 04-05 02-03 01
C-26 Hartland Fish Passage 01
C-28 Tusher Screen 06-07 02-03 01
C-29 GVIC Fish Screen O&M 08-09 06-07 04-05 02-03 01
C-29a/138 Retrieve Native Fish From GVIC & GVP Canals 06-07 04-05
C-33/116 Redlands Screen O&M 08-09 06-07 04-05
146 CPM Entr. Yampa 08-09 06-07

Scopes of Work: Nonnative Fish Management (2009-2001)

Project 2009-2008 2007-2006 2005-2004 2003-2002 2001
87a Cyprinid Removal-Utah 01
87b Cyprinid Removal-CO 02-03 01
89 Colo. R. Centrarchid Removal 02-03 01
98 Yampa R. Nonnative Fish Mgmt. 01
98a/125 M. Yampa R. Northern Pike/SM Bass Mgmt. 08-09 06-07 04-05 02-03
98b Upper Yampa R. Northern Pike Mgmt. 08-09 06-07 04-05 02-03
98c Upper Yampa R. Northern Pike Tagging 06-07 04-05
106 Nonnative Stocking Regs. 02-03 01
109 Middle Green R. Nonnative Mgmt. 06-07 04-05 02-03 01
118 Elkhead Nonnative Fish Escapement 04-05 02-03
119 Starvation Sportfish Escapement 06-07 04-05 02-03
120 Bottle Hollow Screen 02-03
123 Middle Green R. Smallmouth Bass Mgmt. 08-09 06-07 04-05
123a GR Bass Mgmt./Echo Park-Split Mtn 08-09 06-07
123b GR Bass Mgmt./Split Mtn-Ouray 08-09 06-07
124 Duchesne R. Nonnative Fish Mgmt. 06-07 04-05
125 M. Yampa R. SM Bass & Pike Mgmt. 08-09 06-07
126a Co R. SM Bass Removal 08-09 06-07
126b Co R. Non-native Removal Grand Valley to Potash, UT 08-09 06-07
137 Centrarchid Mon. Plan 04-05
140 Yampa R. Fish Response 08-09 06-07 04-05
143 Yampa R. N. Pike Sources 06-07
144 Green R. Fish Response 08-09 06-07
150-GR White Sucker Removal 08-09 06-07
153 SM Bass Removal/Ichthyofauna in Cross Mtn 08-09
154 NNF Control in Lower Green R. & Tribs. (Duchesne) 08-09
157 Weir (Duchesne R.) 08-09
158 Middle Green R. Low Velocity Survival Larval Pikeminnow 08-09
C-18/19 Chemical Fingerprinting 08-09 06-07 04-05 02-03 01
C-20 CPW Reservoir Screening O&M 08-09 06-07 04-05 02-03 01
C-31 N. Pike Exclusion 04-05 02-03 01
FR-115 FG Releases on Lodore/Whirlpool Fish Comm. 08-09 06-07 04-05 02-03

Scopes of Work: Propagation & Genetics (2009-2001)

Project 2009-2008 2007-2006 2005-2004 2003-2002 2001
29a Grand Valley 08-09 04-05 02-03
29b(29a2) Ouray 08-09 04-05 02-03
29c Wahweap 08-09 04-05 02-03 01
29d Mumma 08-09 04-05 02-03
105 Pikeminnow Translocation 02-03 01
151 Gila Survival 08-09
C-6 Baeser RBS in Beaser Bend 08-09
C-7 Prop. Facilities & Equip. 04-05 02-03 01
C-7a Wahweap SFH Facilities Expansion 02-03

Scopes of Work Research, Monitoring, and Data Management (2009-2001)

Project 2009-2008 2007-2006 2005-2004 2003-2002 2001
15 Larval Fish Lab Identification 08-09 04-05 02-03 01
16/22a1/22b Database Management 08-09 04-05 02-03 01
22c UDWR CPM Mon.(ISMP) 02-03 01
22f Yampa/L. GR/CO CPM Larval Abundance 08-09 04-05 02-03 01
50 Eval. RBS Stocking 02-03 01
111 Mon. Stocked Fish 01
112 Catostomid Key 01
121 Survey Larval RBS/Gunnison R. 08-09 04-05 02-03
127(22a2) Upper CO R. CPM Pop. Est. 08-09 04-05 01
128a(22i) Green R. CPM Pop. Est. 04-05 02-03 01
129(22k) HBC Pop. Est. in Deso/Grey 08-09 04-05 02-03 01
130(22l) HBC Pop. Est. in Cataract 09-10 04-05 02-03 01
131(22a3) HBC Pop. Est. in Black Rocks 08-09 04-05 01
132 HBC Pop. Est. in Westwater 08-09 04-05
133(22a4) HBC in Yampa Canyon 04-05 01
138 Fall YOY CPM and small-bodied fishes (GR & lwr CO) 08-09 04-05
139 Pub. of Supp. Update Larval Sucker Guide 04-05
149 Cyprind Computer Key 08-09
158 Assess larval CPM in middle Green River 08-09
159 RBS Anal. & Mon. Plan 08-09
160 Larval RBS in L. Green River 08-09

Scopes of Work: Information, Education and Outreach (2009-2001)

Project 2009-2008 2007-2006 2005-2004 2003-2002 2001
12 General I&E 08-09 06-07 04-05 02-03 01
12A Yampa R./N. Pike Trans. 01
12B GV Projects 08-09 06-07 04-05 02-03 01
12C Coord. Resv. Oper. 08-09 06-07 04-05 02-03 01
12D Coord. Facilities Oper. 01
12E Floodplain Restoration 04-05 02-03 01
12F Pond Rec. Pub. Invol. 04-05 02-03 01
12G Project Wild 02-03 01
12H Interpretive Signs/Exhibits 08-09 06-07 04-05 02-03 01
12I Ruedi Reservoir Agreement 08-09 06-07 04-05 02-03
12J Interactive Basinwide Map 06-07 04-05 02-03
12K Tributary Plans/PBO's 04-05 02-03
12L Pub. Invol.- Nonnative Fish 08-09 06-07 04-05
152 Elkhead Dam/Res. Signs 08-09

Scopes of Work: Program Management (2009-2001)

Project 2009-2008 2007-2006 2005-2004 2003-2002 2001
1 Utah 08-09 06-07 04-05 02-03 01
2 Reclamation 08-09 06-07 04-05 02-03 01
3 Service 08-09 06-07 04-05 02-03 01
4 Colorado 08-09 06-07 04-05 02-03 01
5 Wyoming 08-09 06-07 04-05 02-03 01
C-21 Capital Projects 08-09 06-07 04-05 02-03 01
122/142 Technical Assistance 08-09 06-07 02-03